Brick Paver Installation & Edging



Staging of product

Many paver tasks will vary depending on gain access to, site conditions, project size and of course, the weather. Cautious consideration must be taken to determine the time to begin the paver installation.

The foreman or job manager must always have the products (sand/ pavers) dispersed around the job website for easy and effective installations. Paver pallets/bundles ought to be positioned in a manner not to hinder the paver installation. The proper pallet/bundle placement can make the real project installation simpler and quicker by reducing the general labor of handling the product.

Brick paver patterns

Pavers can be positioned in various patterns depending upon their shape. Each paver shape will typically have numerous different hatch patterns that are offered by the manufacturer.

Contractors require to take into consideration the traffic weight loads on their paver tasks. In most applications worldwide, it has actually been shown that pavers laid in a herringbone pattern have actually performed sufficiently.

Pavers that are 60 mm (2 - 3/8 in) density are suitable for pedestrian applications. Pavers that are going to be used in business or industrial applications must be 80 mm (3 - 1/8 in) in density.

Reference/starting point for brick paver installation

There are a number of conditions that identify the beginning point of a paver project.

When starting to set up pavers it is best to snap a real straight chalk line on the surface of the bedding sand or pull a true straight string line above the surface area of the bed linen sand at the ended up elevation of the pavers This will help as a guide for preserving straight joint lines and will likewise permit the installer to make adjustments in the alignment of the pavers.

Structures and concrete suppressing are generally not straight and ought to not be utilized for developing straight joint lines. Making use of string lines is necessary to identify the true straightness of the edge too. As the paver installation progresses, the string lines will assist decrease the requirement for small trim pieces.

Joint width between pavers must be in between 1/16 and 3/16 in (2 and 5 mm ). There are some pavers with spacer bars on their sides. These will keep a minimum joint width and allow the bedding and jointing sand to go into in between each paver. Pavers with spacer bars are usually not laid in snug versus each other since a string line will offer constant joint spacing.

Installation of brick pavers.

One of the most commonly used techniques for the installation of pavers is hand installation of each paver. It is best to set up a single row of pavers along among the true straight lines that you have actually pulled or above the bed linen sand. This will provide you a straight and real line off which to work. As soon as this row is developed, you can continue to work external into the field with the rest of the pavers. Always make sure to periodically check your joint lines to make sure they are true and straight. If not, modifications to the pavers can be made as you continue installing. Pavers must be set up hand tight. The very best approach is to position a paver versus another one and let it move down into the bed linen sand. Do not kick or tap the pavers into location as this can toss your lines out of real straightness.

When installing pavers on a steep grade, they ought to be installed at the base of the grade going uphill. This will prevent the pavers from creeping as they are being laid.

On large commercial and industrial applications, hand laying pavers would not be cost effective due to the labor intensity. The best way for installing pavers on large projects is to install them mechanically. The use of a mechanical laying machine can install approximately 6000 - 7000 sq ft a day. There are a couple products a specialist need to think about prior to setting up pavers mechanically:

1.) Mechanical installers are just efficient in installing pavers in certain patterns.

2.) The contractor must make sure that the maker can production and bundling pavers in the preferred pattern on the pallets for easy Paver Installation Boca Raton mechanical installation.

3.) Professionals may encounter a color mixing scenario coming off the packages of pavers Poor color mixing could result in a patchy looking installation. The majority of makers follow color blending on each bundle of pavers, but it is the specialist's duty to make sure appropriate blending in the field.

Cutting treatments for brick pavers.

Professionals generally have two methods of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is equipped with a diamond blade. The diamond blade cut-off saw or brick saw will provide a much cleaner and more precise cut. A lot of brick saws will have a hose pipe attachment on them which will allow the operator to cut the pavers damp. When cutting pavers damp, it will help minimize dust and will lengthen the diamond blades life also. The operator of the brick saw ought to constantly cut the pavers far from the surface of the paver field when cutting wet, due to that the pavers will produce a slurry that will stain the paver surface. Pavers that are cut must not fit tight, adequate spacing should be readily available for jointing sand.

The brick saw operator needs to always wear the correct security that is needed for running a saw, such as eye, ear, respiratory and hand defense ).

Edging types

Edge restraints play a significant role in the total success of an interlocking pavement installation Edging restraints get rid of lateral movement of the pavers and hold the pavers securely together. Particularly at the external boundary of the paver application, without an edging restraint, your project is ensured to fail over time.

Generally made edge restraints are the most typically utilized by professionals. Manufactured edging restraints can vary from, plastic edging, steel and aluminum, timbers or precast concrete and stone.

Edging installation.

This could result in the migration of the bedding sand and ultimate lateral movement of the pavers. If there is a possibility of losing bed linen sand in between the pavers and the edge restraint, then geo textile fabric is suggested. When a gap between the pavers and the edging goes beyond 3/8" (10mm), then the space must be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers have to be compacted. The whole location that is to be compressed should be swept clean of any foreign things and debris that can cause scuffing or scratching on the surface of the pavers.

It is essential to have a compactor that can put in in between 3000lbs. And 5000 lbs. Of centrifugal compaction force. In addition, it is very important that the very first compaction takes place prior to any jointing sand has actually been applied to the pavers. If jointing sand is applied to the pavers before compaction occurs, this can trigger a bridging problem and will not enable the joints to be entirely filled with jointing sand. This can also prevent the pavers from being appropriately set into the bed linen sand.

When condensing the pavers, it is recommended that you make at least 2 passes in various instructions across the pavers. This will enable the pavers to be appropriately embeded in the bedding sand and will force the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is really important to the final performance of the pavers. Failure to do appropriate compaction can lead to contortions and pavement failure over time.


Paver pallets/bundles ought to be put in a way not to interfere with the paver installation. One of the most extensively used methods for the installation of pavers is hand installation of each paver. The operator of the brick saw must constantly cut the pavers away from the surface area of the paver field when cutting wet, due to the fact that the pavers will produce a slurry that will stain the paver surface. Edging restraints get rid of lateral motion of the pavers and hold the pavers securely together. When a gap between the pavers and the edging surpasses 3/8" (10mm), then the area must be filled with cut pavers.